FEES   ₽0.08432  -0.26% Market Closed

FSK-Rosseti PAO
Last Events:

2023-10-29 The hottest instrument.

2023-10-28 The hottest instrument.

2023-10-27 The hottest instrument.

2023-09-27 The hottest instrument.

2023-08-03 Signal in RSI changed from bullish recovery to bullish weakening. RSI indicator is in overbought territory and it heading south. These factors indicate that perhaps the upside trend is coming to an end. Last signal: entrance to the overbought zone.

2023-07-31 The hottest instrument.

2023-07-30 Signal in RSI changed from bullish weakening to bullish recovery. RSI indicator is in the upper part of the neutral territory and it grows. These factors indicate that positive dynamics persists. Last signal: entrance to the overbought zone.

2023-07-30 Trend Power changed from medium strength to .


Current temperature: 15.43

50-50 Year Forecast
Low with % probability:
Target: 0.08
High with % probability:
Analyst Recommendations:
Number of estimates
Target Price Mean
Mean unverified/preliminary /
Target Price Low / High /
Median / STD DEV /
Tech Forecasts:
More signals
  < 1M 1-3M > 3M
total None None Sell
rsi ActivelyBuy Buy None
macd None None None
stoch None None None
ma20 None Sell Sell
ma50 ActivelyBuy None None
ma100 None None Sell
Candlestick PatternSept. 4, 2024 Three Gaps Down - pattern is a made up of four black candlesticks. Pattern appears on a uptrend and consists of three consecutive days each gapping lower on the open. Considered to be a bullish reversal pattern.
ISIN RU000A0JPNN9
Website https://www.fsk-ees.ru
Public Joint-Stock Company Federal Grid Company of Unified Energy System develops, operates, and manages the Unified National Electric Grid in Russia. It offers electricity transmission services to regional distribution companies, retail electricity suppliers, and large industrial enterprises; and maintains and develops the grid systems and supervises grid facilities and infrastructure in 78 Russian regions. The company also provides electricity transmission and technological connection services to participants of the wholesale electricity and capacity market. It operates approximately 149 thousand kilometers of transmission lines and transformer capacity approximately 352 GVA. The company was incorporated in 2002 and is based in Moscow, Russia. Public Joint-Stock Company Federal Grid Company of Unified Energy System is a subsidiary of PJSC Rosseti.